Mid-February update

Too much work lately, and not enough updates! Lots has happened the last couple weeks. As usual, I'll let the pics speak for much of it.

I got some pine shiplap milled at a great place in Jasper, GA. I insulated and started at the back (bedroom) and have been kind of doing everything as I move forward. The framing is all pretty much in place, so I've been running electrical, insulating, and installing the shiplap. I also got the flooring in last week. I finished installing it in every room but the bathroom. I've hung the door for the bathroom on the barn door hardware. We bought the door from a salvage place before the building began. It has panes, but I covered the panes in an old piece of rustic metal.